Monday 2 March 2015

Fairing 95% finished

Well, I have spent loads of time trying to get this fairing to fit! I had to buy longer Dzus quarter turn fittings for the bottom and fabricate most of the brackets to get it to fit. I still have one bracket to make as I still have one more issue.

Looks like the weather will be good next weekend, so I have planned to go down to ledenon for a test day/weekend. The 350 needs a bit of a run in and I need to test all the changes that have been made to the 500 since the rebuild.

It will all depend on whether the snow melts in the drive in order to load the lorry!

Plus I will need to finish the forks on the FZR as it is currently blocking the door. Before Friday!

Pheww....

No comments: