The bikes are both nearly ready. Distilled water has replaced the anti-freeze (put in over winter - but illegal on the track), the pipes are back on the RG, and the battery has been installed in the RD. Both bikes are basically ready to roll. I will start the bikes this week, and ensure everything is running OK, then prepare for Nogaro.
No comments:
Post a Comment