Monday, 23 June 2014

Adjustable Ignition modifications

After having bought an adjustable pickup last year, I was disappointed that I couldn't get it to work with my zeeltronic ignition, after some investigation Borut sold me a more sensitive unit designed to work specifically with the Mark Dent adjustable pickup.

Since putting the engine back together I have been avoiding trying the ignition for fear of it still not working, so last weekend I bit the bullet, and sure enough it still didn't work! Fortunately the original Suzuki pickup still worked so I had a backup plan.

Moving the adjustable pickup back and forth I could sometimes see a signal by kicking it over, and looking at the rpm with the handheld programmer plugged into the ignition box, so I was thinking it was a problem of gap between the pickup and the crank web cut out. Also the sliding part of the adjustable ignition was not sitting flush with the body of the adjuster, which could also allow air leaks, so my plan was to take some material off the adjuster to have it sit flush with the body and also countersink the screw hole, to enable the pickup to sit lower, and close to the crank web.

I took off a couple of tenths in the lathe and then setup up the milling machine to drill the hole, managed to find a drill (just under 12mm diameter) and set about gently drilling the hole. I took off less than a millimetre before trying it out, and low and behold I can now get a signal even in the fully advanced position. I still used a good blob of gasket silicon, to ensure it is sealed correctly, but for the moment I should have sparks!

Friday, 30 May 2014

Carbon rotary valves

Sorry haven't updated the blog for a while, I am in the middle of doing lots of fibre glass and carbon trying to repair my fairings. Will post some of the results when I am happy with them!

In the meantime, bought some replacement standard 116mm carbon rotary valves from Maranello along with some screw on hubs, (should reduce cost in the future, as I will only have to order the disks).I am hoping these will enable better drivability, as I am no longer racing could be better with these.

Sunday, 11 May 2014

Ducati first ride

Took the ducati out with it's new battery. It would have started first kick but one of the wires on the battery had pulled off the fuse box, so no 'letrics. Still didn't take me long to fix it, and then it started first kick (almost). Just went for a quick run to fill her up and pump up the tyres. When I got back I changed the oil and fitted the new mechanical filter thing that Chris had bought last year. 4lts of clean mineral oil and a quick tighten of the chain, all is in order for another season of fun!

Also started to repair my fairing on the RG. Which I think will end up with plenty of filler if it is going to look smart again. I will need to source some of those metalic through thingies for the bottom fairing stay as it was ripped pff in my last fall.

Monday, 5 May 2014

Pipes on Carbs on - nearly there

I have been a bit slack recently with the work on the bike, but still the exhausts have gone back on, and the Nr3 carb wedge has been re-worked to clear the rotor a bit better, I have added a spacer which brings the carb out another 10mms I just hope it doesn't affect the cylinder breathing, but will just have to see. The only other way to do it would be to either abandon the standard rotor/stator for something smaller or tilt the carb up wven further.

Next on the list is fixing the fairing!

Wednesday, 12 March 2014

Cranks in..... again!

I've got the impression I have seen this photo before.....

Monday, 10 March 2014

Engine back in.... Gearbox in

Well Saturday, morning I finished replacing bearings in the crankcase, they are all new now except the blind one in the gearbox, which felt ok (read I don't have a blind bearing remover!), the primary shaft was also dismantled and a new bearing fitted in the middle, plus the one at the generator end was replaced (that was the expensive one!). There is something about smacking lumps of steel into my poor weak aluminium crankcase which makes this process somewhat stressful, knowing that RG 500 crankcases are like rocking horse manure - although I find with age, I tend to succeed these things rather than 30 years ago I would have messed it up!


After that I cleaned up the water pump and re-installed the pump and cover, and then put the engine back in the frame, while it is still light enough to carry. All three engine fixing points lined up OK, (no warping of the engine cases - phewwww!), so then the gearbox went back in. Had to resort to asking my fellow gamma owners (on the Gamma list), where the 1mm O'ring on the end of the secondary shaft went - so that stopped play, just in time for a lovely ride out on Libby's Street - just to charge the battery you understand! 

Anyway the O'ring goes on the outside of the main output shaft bearing, so that was duly put in place Sunday morning, I must have removed the box at least 10 times, due to a number of little problems - first the kickstart mechanism somehow moved, and then I lost the small tab that holds the gearchange barrel in place, in fact it had jammed in the gear change mechanism, - thank goodness the gears would move because I was 2 steps a way from fitting the kickstart and heaving on it, which obviously would only have made things worse! Anyway after all the faffing about, got the gearbox in and tightened up, then I had to fit the rear sprocket, in order to hold the clutch inner basket for tightening, so then I fitted the neutral switch ball and spring (spring goes in first) and the oil pump plate (no pump here), and then the gear lever plate, which was very stiff to fit (hmmmm), and finally the rear sprocket and chain!

After a lot of heaving on the end of a spanner the clutch was fitted, and the cover on, and now all that is left is the rest! Another great ride out on the Dayto Sunday afternoon with Fred on his Moto Guzzi, should have taken the Ducati really but I haven't tested the work that was done on it, and I should probably change the oil. Still I needed all the power of the Daytona to keep up with Fred, a really lovely afternoon, around 15-16 degrees, and then back in time for a few beers in front of England beating Wales - what better way to spend a day!

Sunday, 2 March 2014

Crankcase welded

Collected my crankcase from the neighbours. Let's say a strong weld (but not that pretty). Still, Yves also provided the main output bearing, which spent the night in the freezer and was quickly drifted in.

I spent the rest of Saturday morning ordering the other bearings some from Suzuki and a couple from simply bearings in the UK. Surprisingly standard sizes except one end of the primary shaft which is specific and goes for 80 euros! (The  roller bearing).

I spent some time cleaning up the crankcase halves.

I also removed the gold valves from the 350 forks and loosened off the damping adjuster leaving about 5 threads showing. This I am hoping will bring back some of suppleness it had.

Sunday I made up a wheel spacer to replace the speedo drive just coz I can :-) the dimension are ID 20 length 34mms, I made it with a shoulder to give the bearing a bit of weather protection. My biggest drill bit for the lathe is 18mms, so for the first time I used my boring tool, which needed to be mounted really high to fit in the 18mm hole. Worked OK but it left quite a rough surface.